Mr C - Brockworth

Kitchen Installation

The Process:

  1.  The existing bathroom suite had to be removed
  2.  The exisitng cupboard was taken down
  3.  All existing plumbing had to be modified to replace the old bath with a new shower
  4.  The floor was strengthened and ply was put down on top
  5.  We built a new smaller cupboard
  6.  Replaced the old door with a new one
  7.  Next all the walls were tiled
  8.  Then the new bathroom suite was fitted including, toilet, basin and shower
  9.  Finally a cushion flooring was put down

RETURN TO PREVIOUS PAGE

Stewart Kitchens  Bathrooms Bathroom 6 Image 10
Stewart Kitchens  Bathrooms Bathroom 6 Image 11
Stewart Kitchens  Bathrooms Bathroom 6 Image 12
Stewart Kitchens  Bathrooms Bathroom 6 Image 6
Stewart Kitchens  Bathrooms Bathroom 6 Image 13
Stewart Kitchens  Bathrooms Bathroom 6 Image 8
Stewart Kitchens  Bathrooms Bathroom 6 Image 9
Stewart Kitchens  Bathrooms Bathroom 6 Image 6
Stewart Kitchens  Bathrooms Bathroom 5 Image 5
Stewart Kitchens  Bathrooms Bathroom 6 Image 3
Stewart Kitchens  Bathrooms Bathroom 6 Image 2
Stewart Kitchens  Bathrooms Bathroom 6 Image 4
Stewart Kitchens  Bathrooms Bathroom 6 Image 5

What our customers think
"We're so glad we found Les! Les was reliable, punctual, communicative, friendly without being intrusive and most importantly, very good at his job."
Alex Vernon Kitchen Renovation

 

GET IN TOUCH

Simply fill in the form below and we'll get back to you as soon as possible.

 

Invalid Input
Invalid Input
Invalid Input
Invalid Input
Invalid Input
Invalid Input