Mr O - Newnham

Bathroom Installation - Heated Flooring

The Process:

  1.  First the floor mat was put down
  2.  The floor wasn’t quite level and the adhesive was quite thick in places, so a levelling system was used to ensure there was no lippage
  3.  The pipes were fitted
  4.  Once the pipes were in the floor was tiled